ok, it's DEFINITELY that time ....
so i been a lil on the sneeky side trying to keep on the low, but i'll let ya'll in
i finally gathered up all the parts and took care of all the work(LOTS of it)!
Parts list:
JDM DOHC F22B = received
" " " injectors = received
3-angle valve job(3 on head and 2 on valves ) = done
Bisimoto IM spacer/insulator = received
head resurfacing = done
polished ports = done
bottom milled 20 1/2 thousandths(thnx to every1 for the help! ) = done
New viton valve guide seals = received
Skunk2 6bolt adj. cam gears = received
ALL new gaskets and seals = all taken care of
ARP head studs = waiting for shipment
new cap, rotor, and seal for distributor = received
chipped/socketed p06(plan on tuning w/ Uberdata) = received
here's some pix for ya'll to enjoy (56K DIE!!!!!!!!!!)
this was my attempt to get that angle to show but not too noticable
i'll post some more pix of the rest of the parts when i get a chance and keep ya'll updated
HOPEFULLY i'll be down for doing the swap next week wish me luck!
so i been a lil on the sneeky side trying to keep on the low, but i'll let ya'll in
i finally gathered up all the parts and took care of all the work(LOTS of it)!
Parts list:
JDM DOHC F22B = received
" " " injectors = received
3-angle valve job(3 on head and 2 on valves ) = done
Bisimoto IM spacer/insulator = received
head resurfacing = done
polished ports = done
bottom milled 20 1/2 thousandths(thnx to every1 for the help! ) = done
New viton valve guide seals = received
Skunk2 6bolt adj. cam gears = received
ALL new gaskets and seals = all taken care of
ARP head studs = waiting for shipment
new cap, rotor, and seal for distributor = received
chipped/socketed p06(plan on tuning w/ Uberdata) = received
here's some pix for ya'll to enjoy (56K DIE!!!!!!!!!!)
this was my attempt to get that angle to show but not too noticable
i'll post some more pix of the rest of the parts when i get a chance and keep ya'll updated
HOPEFULLY i'll be down for doing the swap next week wish me luck!
Comment